Power 0.12-1000 kW
Dust group IIIA · IIIB · IIIC
Temp. class T125 °C
ABB ABB Authorized Value Provider · Benelux

ABB M3GP ATEX Dust Ignition Proof motors (Zone 21/22 dust)

The ABB M3GP Ex tb is the ATEX version for dust-explosive environments (Zone 21/22), grain silos, carbon dioxide installations, flour and sugar processing. IE3, 0.12 kW to 1000 kW.

What is an Ex tb motor?

An Ex tb motor (formerly Ex tD) is certified for zones where an explosive dust mixture may occur. The motor has a hermetically sealed housing, optimised IP rating (IP6x), and special surface temperature limitation to prevent dust ignition.

Typical dust-explosive applications

Ex tb is deployed where fine flammable substances can occur in suspension.

Replacement dust-Ex motors

For dust-zone replacement the IP rating, gas group IIIx and T class is crucial. Send a nameplate photo via our dimsheet request, we verify complete ATEX/IECEx compliance. Delivery 1-3 weeks from ABB Vaasa stock depending on version.

Example variants in this series

A selection of 4-pole versions for reference. See full product list for all variants.

Type Power Speed Frame IE class Article no.
M3GP 80MLD 4 0.55 kW 1500 rpm 80 IE3 3GGP 082 440-A K
M3GP 90LD 4 1.5 kW 1500 rpm 90 IE3 3GGP 092 540-A K
M3GP 132SMF 4 5.5 kW 1500 rpm 132 IE3 3GGP 132 260-A K
M3GP 160MLA 4 11 kW 1500 rpm 160 IE3 3GGP 162 410-A K
M3GP 180MLB 4 22 kW 1500 rpm 180 IE3 3GGP 182 420-A K
M3GP 225SMB 4 45 kW 1500 rpm 225 IE3 3GGP 222 220-A K
Alle ABB-motoren in de doorzoekbare productlijst Filterbaar op serie, vermogen, frame en specs

Frequently asked questions

What is an Ex tb motor?
An Ex tb motor (formerly Ex tD) is certified for zones where an explosive dust mixture can occur (Zone 21/22). Hermetically sealed housing, optimised IP rating (IP65 standard, IP66/67 on request), and special surface temperature limitation to prevent dust ignition. Dust groups IIIA, IIIB and IIIC.
Which applications need Ex tb?
Dust-explosive environments where fine flammable substances can occur in suspension: grain and seed silos, transport elevators, flour mills and dough mixer installations, sugar and coffee processing, feed mixer installations, wood processing with dust extraction, coal and coal dust handling, aluminium and magnesium processing, pharmaceutical powder production, plastic pellet production and compounding.
What is the difference between Zone 21 and Zone 22?
Zone 21: regular occurrence of explosive dust mixture (during normal operation); comparable risk level to Zone 1 for gas. Zone 22: rare or no occurrence of explosive dust mixture; comparable to Zone 2. For both zones the same Ex tb category 2D applies with different equipment categories, we verify at quote which exact category you need.
Lead time Ex tb dust motors?
Typically 1-3 weeks from ABB Vaasa stock depending on version. For more complex configurations (higher IP rating, specific dust group, T class adjustment) lead time is 4-6 weeks. For exact replacement we ask for your existing nameplate photo plus your dust database/zone document.